Producten
- Vaste stoffen controleapparatuur
- Triple Deck Shale Shaker
- Lineaire beweging Shale Shaker
- Vacuüm Degasser
- Modder schonere
- Desander
- Desilter
- Decanteren Centrifuge
- Sludge Vacuum Pump
- Verticale snijden droger
- Drogen Shale Shaker
- Jet modder Mixer
- Modder Agitator
- Centrifugaalpomp
- Schuintrekken pomp
- Onderdompelbare drijfmest pomp
- Modder Gun
- Modder Gas scheidingsteken
- Brand ontsteking apparaat
- Schroef pomp
- Hydratatie Tank
- Modder Tank
- Motor Control Center kamer
- Schroef transportband
- Offshore Mud Skip Container
- Barite Bulk Silo
- Vaste stoffen controlesysteem
- Reserveonderdelen
Contact
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Gevallen
-
Vehicle-Mounted Drill Cuttings Disposal System
Vehicle-Mounted Drill Cuttings Disposal System Vehicle-Mounted Drill Cuttings Di...
-
Drill Cuttings Disposal System in XINJIANG OilFiel...
Drill Cuttings Disposal System in XINJIANG OilField Brightway Dril...
Tunnel saai Machine systeem gevallen
BWSP-250 Separation Plant For Pipe-jacking Project in Thailand
2025-01-10
BWSP-250 Separation Plant For Pipe-jacking Project in Thailand
Brightway one set BWSP-250 Separation Plant has been completed commissioning and started operation in Thailand. This Separation Plant will be used to treat the slurry generated during the tunneling process of pipe jacking machines. The Separation Plant is equipped with a shale shaker and a desander/desilter unit, with a processing capacity of up to 250 cubic meters per hour.
At present, The country is implementing a number of urban infrastructure projects, One project is the laying of underground sewers in MG City. The total length of the project is about 18 kilometers, and divided into several sections of construction, A pipe jacking machine with an inner diameter of 1.8 meters is installed on site. the well depth is 12 meters. After completion, the project will solve problems of the urban drainage and sewage effectively. In this project, Brightway company design and manufacture the slurry separation plant to macth with the pipe jacking machine.
You can know more the details from the page as follow: https://www.brightwaysolids.com/On-site-Service-of-Underground-Pipeline-Project_n244
Vorige :Sludge Dewatering Unit for Rive Dredge Dewatering
Volgende :BWSP-150 Separation Plant for Micro-tunneling Project in Qatar