Huis > Tunnel saai Machine systeem gevallen

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Gevallen

Tunnel saai Machine systeem gevallen

BWSP-150 Separation Plant for Micro-tunneling Project in Qatar

2025-01-10

 

BWSP-150 Separation Plant for Micro-tunneling Project in Qatar

 

Brightway BWSP-150 separation plant, which is designed for MST Pipe-jacking machine of Qatar clients, has been transported  to the scene.  Brightway  technical services team has arrived in the same period and will be provide after-sales service to the customer. includs: equipment installation, equipment testing, equipment operation training.

 

BWSP-150 Separation Plant for Micro-tunneling Project in Qatar

 

 BWSP-150 Separation Plant for Micro-tunneling Project in Qatar

 

Know More: https://www.brightwaysolids.com/Micro-tunneling-Separation-Plant_p33.html

 

Vorige :BWSP-250 Separation Plant For Pipe-jacking Project in Thailand

Volgende :BWSP-150 Separation Plant for Malaysia Trenchless Construction

Feedbackformulier

* Uw naam:
* E-mail:
* Bedrijf:
* Fax:
* Telefoonnummer:
* Bericht: