Producten
- Vaste stoffen controleapparatuur
- Triple Deck Shale Shaker
- Lineaire beweging Shale Shaker
- Vacuüm Degasser
- Modder schonere
- Desander
- Desilter
- Decanteren Centrifuge
- Sludge Vacuum Pump
- Verticale snijden droger
- Drogen Shale Shaker
- Jet modder Mixer
- Modder Agitator
- Centrifugaalpomp
- Schuintrekken pomp
- Onderdompelbare drijfmest pomp
- Modder Gun
- Modder Gas scheidingsteken
- Brand ontsteking apparaat
- Schroef pomp
- Hydratatie Tank
- Modder Tank
- Motor Control Center kamer
- Schroef transportband
- Offshore Mud Skip Container
- Barite Bulk Silo
- Vaste stoffen controlesysteem
- Reserveonderdelen
Contact
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Gevallen
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Bedrijfsnieuws
Jidong Oilfield Drilling Waste Disposal System Delivery
2020-06-16
Recently, Brightway produced drilling waste disposal system for Jidong Oilfield affiliated units. This equipment includes 2 sets of vertical cuttings dryer and 3 sets of decanter centrifuge. The final installation and commissioning work is currently in progress and is expected to be delivered to customers in the short term.
Most of the drilling projects in Jidong Oilfield are located near the offshore areas and shrimp ponds. In order to protect the ecological environment, Jidong Oilfield has been actively advocating and practicing green drilling, and adopted corresponding environmental protection measures for each well in the drilling construction. Among them, for the waste drilling fluid generated by drilling and waste mud treatment, the oil field has invested a batch of special treatment equipment, namely drilling waste disposal system. The equipment that Brightway produced for customers this time is an important cooperation that helps the environmental protection construction of Jidong Oilfield.
At present, the decanter centrifuge has been completed, and the drill cuttings dryer project has been completed 90%, Brightway workers are doing the final installation and commissioning work, it is expected to be sent to the oilfield drilling site by the end of this month. Know more about oilfield environmental protection equipment or to consult drilling waste disposal system, please click the link:http://www.brightwaysolids.com/Drilling-Waste-Management_d13
Vorige :250bbl Water Based Mud Plant for Drilling Rig
Volgende :12500bbl Liquid Mud Plant in Mid-East