Huis > CBM en geothermische goed systeem gevallen

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Gevallen

CBM en geothermische goed systeem gevallen

Fluids Cleaning System for CBM Drilling Rig on Site

2017-05-19

Fluids Cleaning System for CBM Drilling Rig on Site

The Drilling Fluids Cleaning System is matching with the CBM Drilling Rig. The pictures as blow was taken in Shanxi Province of China, September 18, 2015. 

The Drilling Fluids Cleaning System is composed of 2 Sets Shale Shaker, Bwzs70-3p. 1 Set Mud Cleaner, Bwzj70-2s12n, 3 Sets Centrifugal Pump, Bwsb8x6-13j, 37kw, 6 Sets  Mud Agitator, Bwjbq11, 11kw, 1 Set Submersible Slurry Pump, 1 Set Jet Mud Mixer, Bwslh150-50,3 Sets Mud Tank.

 

 

 

Vorige :500GPM Mud Recycling System Sent for HDD Drilling Rig of Malaysia Customer

Volgende :Solids Control System for ZJ50DB Drill rig in Tarim Oilfield

Feedbackformulier

* Uw naam:
* E-mail:
* Bedrijf:
* Fax:
* Telefoonnummer:
* Bericht: